NPI Phase 4 - Scaling to Volume Production

The fourth phase of new product introduction (NPI) is preparing to scale your product to mass production. This is completed through three sections: EVT (engineering validation test), DVT (design validation test), and PVT (production verification test). As a contract manufacturer, we review each section carefully ensuring your product is ready to be produced at large volumes.

12+
9 просмотров
9 месяцев назад
25 января 2025 г.
12+
9 просмотров
9 месяцев назад
25 января 2025 г.

The fourth phase of new product introduction (NPI) is preparing to scale your product to mass production. This is completed through three sections: EVT (engineering validation test), DVT (design validation test), and PVT (production verification test). As a contract manufacturer, we review each section carefully ensuring your product is ready to be produced at large volumes.